the height required and tighten the bolts. The antenna rests on this band, as shown in Figure 5, during mounting and azimuth adjustment. Attach hoist lines to the antenna as shown in Figure 9. Raise the antenna carefully and rest the lower channel of the lower mount on the support band. Position the antenna as close as possible to its operating angle. Attach both upper and lower channels of the tower mount to the tower mounting pipe with U-bolts, lock washers, and nuts sa shown in Figure 10. Do not fully tighten the nuts to allow for azimuth adjustment. Remove the hoist lines. |
|